• Construction Management
  • Design Build
  • General Contracting

Building Western Canada Since 1987

West Hillhurst Arena Renovation Calgary, AB

West Hillhurst Arena Renovation

Owner

The City of Calgary

Prime Consultant & Architect

gec Architecture

Completion Date

April 2017

Description

This project consists of a complete Arena Refrigerant Slab Replacement along with all new boards, sports netting, and bleachers, Structural reinforcing of the existing structure to maintain the Architectural look, a complete roof replacement, and a low-e ceiling to be incorporated into the arena.Other challenges on this job lie with the building shares its space with the community association which is operational during construction, having to do a roof replacement during winter months, and the numerous trades that must work together simultaneously to keep the project on schedule.

Country Hills Crematorium Calgary, AB

Country Hills Crematorium

Description

The Country Hills Crematorium was a new construction project done under the Design Build contract delivery method. The building is steel and concrete construction of a new Crematorium facility designed to accommodate Calgary’s Sikh community. The building is over 18,000sqft on a 1.9 acre site and final construction costs totalling 6.4 million dollars. Due to innovative construction practices, and opportunities discovered during design, Dawson Wallace substantially completed the project in June of 2016 some three months ahead of schedule.

Canada Post London Drugs Calgary & Airdrie, AB

Canada Post London Drugs

Owner

London Drugs

Description

This project consisted of inserting a Canada Post within the London Drugs locations, which came equipped with mailboxes, mail services and other essential amenities.

Helen Schuler Nature Center Lethbridge, AB

Helen Schuler Nature Center

Owner

City of Lethbridge

Description

The project consisted of a renovation and an approximately 500 s. m. expansion of the existing building. The additional space has improved working conditions for staff and volunteers, met increasing public demand, and will allow for future programming opportunities. The expansion has modernized the facility, enhanced services, improved accessibility and demonstrated sustainable building practices. Gallery space will support future growth of the cultural sector, foster and strengthen new audiences, and provide much needed space to display traveling science or technology based exhibits.

Windermere Golf & Country Club Edmonton, AB

Windermere Golf & Country Club

Owner

Windermere Golf & Country Club

Description

Dawson Wallace was selected as General Contractor for the demolition of the existing clubhouse and construction of a new two-storey facility. This new 23,400 s.f. clubhouse consists of a Pro Shop, Administration offices and locker rooms on the main floor, Dining Room & Kitchen on the 2nd floor, and underground cart & bag storage. The project was completed using the Construction Management contract format.

Lethbridge Transit Terminal Lethbridge, AB

Lethbridge Transit Terminal

Owner

City of Lethbridge

Description

The Development looked at the modernization and expansion of the existing Lethbridge Transit facilities. This project expanded the transit bus storage capacity, reconfigured onsite vehicle storage capacity, as well as modernizing and expanding the existing office space.

CASA Lethbridge, AB

CASA

Owner

City of Lethbridge

Description

This new 48,000 s.f. facility was developed by The City of Lethbridge to provide a 7 day a week functioning art space. The building features exhibition gallery space, 2D and 3D work shops, woodworking and textile design rooms, dance and theatre halls, and music conservatory practice rooms.

Tim Horton's Kids Camp Kananaskis, AB

Tim Horton's Kids Camp

Owner

Tim Horton's Children's Foundation

Description

The Kids Camp project included the renovation of the main lodge and kitchen area, new construction of bunk houses and relocation of old bunk houses, as well as the installation of a new sanitary septic system and a water treatment plant.