• Construction Management
  • Design Build
  • General Contracting

Building Western Canada Since 1987

Aspen Woods Elementary School Calgary, AB

Aspen Woods Elementary School

Owner

Calgary Catholic School District

Description

This elementary school located in the South West Community of Aspen Woods will begin construction in early 2016. This building is a structural steel and block constructed building on a site area of 5.83 acres. This school will be part of the Calgary Catholic School District and will host 600 kids from grades K-6. This school will have 9 classrooms, an art, music and science room, full gymnasium, and the ability to expand with two future portable classrooms. This school will help kids continue to seek education in the community they are being raised. This complex tender awarded by CSSD is valued at approx. 11.3 million dollars and is expected to be completed for class in 2017.

Mount Pleasant Fire Station #7 Calgary, AB

Mount Pleasant Fire Station #7

Owner

The City of Calgary

Description

The Permanent Response Station No. 7 project is a City of Calgary Building Infrastructure project awarded to Dawson Wallace in November 2015. This Mount Pleasant project includes the abatement and demolition of an existing firehall and rebuild of a 12,320 s.f., three storey fire station with offices, kitchen, sleeping quarters, outdoor over-hanging terrace, and garages. This building is constructed on piles and grade beams and is structural cast-in-place concrete with stone and composite metal panel finish.

The Lethbridge Regional Police Headquarters Facility Expansion Lethbridge, AB

The Lethbridge Regional Police Headquarters Facility Expansion

Owner

The City of Lethbridge

Prime Consultant & Architect

Alvin Reinhard Fritz Architect & Stantec

Completion

March 2017

Description

The Lethbridge Regional Police Service Expansion and Renovation project consisted of the construction of a three-level structure at the rear of the existing building and a two level underground parking structure. The addition added approximately 3,500 s. m. of functional area, making the total building footprint of the headquarters facility approximately 9,500 s. m. The parking structure increased the parking capacity for operational and staff vehicles from 167 spaces to approximately 248.

St. Joseph Seminary (LEED Certified) Edmonton, AB

St. Joseph Seminary (LEED Certified)

Owner

The Catholic Archdiocese of Edmonton

Description

The St. Joseph Seminary project included the new construction of residential units for approximately sixty seminarians and formators, kitchen facilities, administration area and chapel.

University of Lethbridge South Plaza Tunnel Renovation Lethbridge, AB

University of Lethbridge South Plaza Tunnel Renovation

Owner

University of Lethbridge

Description

This was a Construction Management project which included the complete replacement of the South Plaza of the Campus, and while the plaza was disturbed, a rehabilitation of the Physical Education Building Tunnel. Egress from adjacent buildings for the public and building occupants had to be maintained throughout the course of construction, and extreme care was taken during the excavation scope due to the proximity of the site to roadways which had to be maintained and utilities which couldn’t be compromised while construction was underway.

Newman Theological College Edmonton, AB

Newman Theological College

Owner

The Catholic Archdiocese of Edmonton

Description

This two-storey building (28,800 s.f.) includes a library, administration facilities and classrooms for the Catholic Archdiocese of Edmonton. With its high degree of finish, it is a stunning complement to the St. Joseph Seminary on the same site.

Morley Elementary (LEED Gold) Morley Reserve, AB

Morley Elementary (LEED Gold)

Owner

Stoney Tribal Administration

Description

New K-6 Elementary School constructed for the Stoney Tribal Administration. This 46,000 s.f. school includes a running track, ball fields, gym, library, kitchen facilities, multiple classrooms, and multipurpose spaces. This project was completed on time in August 2012. This project was unique in that Dawson Wallace took it over from a contractor that had defaulted. As such, we had little time to take stock of the condition that project was in and react, with the consultant team, to rectify work in parallel with getting the school open on time for the new school year.

Alcoma School Brooks, AB

Alcoma School

Owner

Grasslands School Division 6

Description

This project was comprised of an expansion to the existing 14,000 s.f. school, adding a new gymnasium and new front entrance, to bring the new square footage to almost 19,000 s.f. The existing school was also selectively renovated with new finishes, and new mechanical and electrical systems. The existing gymnasium was converted into a new library, classroom and gathering space for the students. This project was completed on time in August 2012. This project was unique in that Dawson Wallace. took it over from a contractor that had defaulted. As such, we had little time to take stock of the condition that the project was in and react, with the consultant team, to rectify work in parallel with getting the school open on time for the new school year.

Kodiak House (LEED Shadowed) Lethbridge, AB

Kodiak House (LEED Shadowed)

Owner

Lethbridge College

Description

This $12 million, five storey, 109 unit building was built green with a heavy focus on energy efficiency and water conservation. The building’s structure is oriented to take advantage of the famous Lethbridge wind for cooling. The low-cost, dormitory-style rooms will raise by 25 per cent the number of students the college can house on campus.Fifteen of the suites are wheelchair accessible and barrier free for people with moblility issues. Each suite has a private bathroom, and is furnished with a queen bed, desk, and wardrobe. Kitchens are equipped with microwaves, fridges and hotplates.