Emerald Hills Centre, Box C2 and Box E7 Sherwood Park, AB

Emerald Hills Centre, Box C2 and Box E7

Client

ONE Properties

Prime Consultant & Architect

DIALOG

Completion Date

May 2018

Description

We have recently been awarded the construction of two commercial retail buildings at Emerald Hills Centre. Box C2 totals 18,341 s.f., and Box E7 totals 10,515 s.f.

Edmonton Business Campus East, Phase 1 Edmonton, AB

Edmonton Business Campus East, Phase 1

Client

Cameron Corporation

Prime Consultant & Architect

Hodgson Schilf Evans Architects Inc.

Completion Date

August 2018

Description

Dawson Wallace has recently begun work on this 85,573 s.f. office building consisting of three storeys and underground parkade located at 575 - 100 Street NW, Edmonton.

POPEYES Louisiana Kitchen Sherwood Park, AB

POPEYES Louisiana Kitchen

Client

POPEYES Louisiana Kitchen

Prime Consultant & Architect

PlanWorks Architecture Inc.

Completion Date

January 2018

Description

After having recently completed the interior fit-up for POPEYES Louisiana Kitchen in the Griesbach Village retail centre in Edmonton, we have been retained to complete the 1,882 s.f. interior fit-up for POPEYES at their new location in Emerald Hills Centre.

Nose Creek Building E Calgary, AB

Nose Creek Building E

Client

QuadReal Property Group

Architect

Gibbs Gage Architecture

Description

Nose Creek Building E is located directly North of Dawson Wallace’s previously completed Nose Creek Buildings A & C site in Balzac, AB. Dawson Wallace was selected as that Construction Manager on this project due to their value engineering, commitment to schedule, and outstanding relationship with the client. Dawson Wallace has mobilized to site while the building is still being designed. Due to the tight schedule, Dawson Wallace has proposed schedule saving techniques like frost prevention, precast gradebeams, shrink-wrapping the building, and creating a phased line at the middle grid line of the building to erect steel & precast from each end of the building (essentially building two buildings at once) There is also going to be a large TI portion of the job that requires the same completion date as the base building. Dawson Wallace has been working closely with the design team to propose schedule saving techniques in order to meet the schedule demands. This building is scheduled to be completed at the end of September 2018.

GES Canada Tenant Improvement Edmonton, AB

GES Canada Tenant Improvement

Client

Oxford Properties

Prime Consultant & Architect

Wolski Design Group Ltd.

Completion Date

December 2017

Description

We are currently completing new interior construction and exterior alterations at City View Business Park, Building 10 for GES Canada. Their new facility will be comprised of a 23,736 s.f. warehouse area and 5,998 s.f. office.

Wash King at the Bluffs Calgary, AB

Wash King at the Bluffs

Client

Renoir Management Corporation

Architect

Abugov Kaspar

Description

The Wash King at the Bluffs located in SW Calgary off of Heritage Drive, is an 18,000 sq/ft building with a 13,000 sq/ft 14 car wash wand area, a single vehicle Belenger Tunnel Car Wash and two single vehicle automatic wash stations. DW proposed to the owner to use a galvanized structural steel & OWSJ along with numerous other value engineering ideas to add better value and durability to the building due to the likely case of rust in a high humid environment. This high end car wash , that is located right beside the Ferrari, Lamborghini, & Porsche dealership is not like others you’ll see in the City, with stucco and premium alucabond panels on the exterior and eye catching colour scheme. The Car Wash is expected to be open early October, right before their busy winter season.

Emkade Distribution Inc. Tenant Improvement Edmonton, AB

Emkade Distribution Inc. Tenant Improvement

Client

Oxford Properties

Prime Consultant & Architect

Wolski Design Group Ltd.

Completion Date

December 2017

Description

Dawson Wallace has been selected to complete the new interior construction and exterior alterations for Emkade Distribution Inc. at City View Business Park, Building 12. Emkade's new facility will be comprised of a 22,943 s.f. warehouse and 5,613 s.f. office.

Taber Operations and Maintenance Building Taber, AB

Taber Operations and Maintenance Building

Client

Municipality District of Taber

Architect

MPE Engineering Ltd.

Description

Dawson Wallace was awarded the construction of the new MD of Taber Operations and Maintenance Building in December 2016. It is an entirely precast structure complete with a precast mezzanine. The roof structure is comprised of OWSJ, metal deck and metal roofing. The shop space house multiple vehicle lifts as well as two overhead cranes, and has overhead doors on both the north and south elevations. There is also a large office fit up, totaling approximately 8500 ft2. The precast at the office area is accentuated with a wood grain finish and a stain applied on the precast.The building has exterior concrete aprons at the overhead door location, sidewalks to the west as well as an asphalt paved parking lot.

Legacy Corner Shopping Center Calgary, AB

Legacy Corner Shopping Center

Client

Royop Development Corporation

Architect

Gibbs Gage Architects

Description

Dawson Wallace was awarded Royop’s Legacy Corner Phase 1 Buildings A & B project following a successful competitive tender. The project consists of two new CRU buildings and adjacent site construction. This project requires unique construction phasing to install site finishes prior to building foundations to ensure 2017 paving completion as requirements of existing client lease deals.

London Drugs Edmonton, AB

London Drugs

Client

London Drugs Limited

Prime Consultant & Architect

Scientific Architecture Inc.

Completion Date

April 2018

Description

After recently completing projects for London Drugs in St. Albert and Grande Prairie, we have been selected to complete the 34,789 s.f. interior renovation for them at their Oliver Square location. London Drugs remains open to the public during this extensive renovation.

Airport Crossing Buildings 3 and 4 Calgary, AB

Airport Crossing Buildings 3 and 4

Client

Enright Capital

Architect

Dialog

Description

Dawson Wallace was awarded Enright’s Airport Crossings Buildings 3 & 4 project following a successful completion of Phase 1, completed in 2013. This project follows similar structural and architectural designs comprising piles, grade beams, structural steel, and precast panels encompassing newly constructed light industrial space in the Airport Industrial Park.

Aurora Sky Leduc County, AB

Aurora Sky

Client

Aurora Cannabis Inc.

Greenhouse Architect

Larrsen Ltd.

Description

This 800,000 s.f. cannabis production facility is currently under construction at the Edmonton International Airport, under a 30 acre lease from the Edmonton Regional Airports Authority. Aurora Sky is projected to be the world's most advanced cannabis production facility, meeting expanding medical demands. Aurora Sky's location will benefit from services available on site at EIA, including air cargo connections, ground transportation and bonded warehousing, enabling future export of their product and genetics around the world.

Griesbach Village Phase 2 Edmonton, AB

Griesbach Village Phase 2

Client

Brentwood Developments

Architect & Prime Consultant

DIALOG

Completion Date

November 2017

Description

We have been awarded the contract for three multi-use commercial buildings at Griesbach Village, located at 97 Street & 137 Avenue in Edmonton. Buildings 6 (4,450 s.f.), 7 (7,768 s.f.) and 10 (5,672 s.f.)

Plaza 167 Edmonton, AB

Plaza 167

Client

Stratosphere Capital (Brintnell) Ltd.

Architect & Prime Consultant

Hodgson Schilf Evans Architects Inc.

Completion Date

June 2018

Description

We are Construction Managers for this office and retail development at 167th Avenue & Brintnell Boulevard. The development includes a 3-storey office building with 71 stall underground parkade. Each floor will be 17,372 s.f. and will consist of retail, financial, professional and medical tenants. In addition to the office building there will be 3 retail buildings totaling 25,000 s.f. combined.

Strachan Corner Medicine Hat,AB

Strachan Corner

Client

Brentwood Developments

Prime Consultant & Architect

DIALOG

Completion Date

August 2018

Description

Dawson Wallace has been engaged by the Owner, Brentwood Developments, since early 2016 to provide construction management services for their proposed Strachan Corner Development in Medicine Hat, Alberta. These services include but are not limited to: budgeting, design support, scheduling, tendering, methodology & constructability feedback, and cost control.

Construction commenced in January 2017 and includes the demolition of an existing Wal-Mart and related site surfaces and underground utilities. Phase I of new construction will consist of one box store commercial building of approximately 70,000 s.f. containing room for four different retail shops including a new Save On Foods, and one 10,000 s.f. CRU building. In addition, Phase I also includes new underground services and all site improvements including new asphalt parking lot, sidewalks, site lighting and landscaping. Phase II will see future site expansion, adding additional CRU space, stand alone restaurant pads, various tenant fit-ups, and a gas bar. Dawson Wallace has also been engaged to build a new Tim Hortons on the Brentwood development site.

Rundle & Marlborough LRT Renovations Calgary,AB

Rundle & Marlborough LRT Renovations

Client

Calgary Infrastructure - The City of Calgary

Prime Consultant & Architect

Sahuri + Partners Architecture Inc.

Completion Date

August 2017

Description

The renovations of existing Marlborough and Rundle LRT stations incorporate tight phasing schedules to ensure the safe accessibility of LRT patrons coinciding with full demolition and renovations of the existing stations. These stations are being completed simultaneously and are currently on track to be on the tendered schedule.

West Lethbridge Middle School Lethbridge, AB

West Lethbridge Middle School

Owner

Lethbridge School District No. 51

Prime Consultant & Architect

FWBA Architects

Date

August 2018

Description

Construction of a new 70,000 s.f. middle school complete with full site development. The building is constructed out of both structural steel and load bearing block, with a glazed main entrance and over ten different roof lines. This new school will house a large gym, gathering and ancillary spaces, classrooms, a science and shop space, drama and band rooms, and a large library. The school will also be ringed with modular classrooms and room to accommodate future modulars.

Alberta Gaming & Liquor Commission Warehouse St. Albert, AB

Alberta Gaming & Liquor Commission Warehouse

Owner

Alberta Gaming & Liquor Commission

Completion Date

April 2018

Description

The AGLC warehouse will serve as the main distribution centre for spirits, wine and imported beer for the Province of Alberta. The building spans 479,000 s.f. on 55 acres of land, including a multi-level main floor and 2-storey shipping office. The complete building (including all equipment and racking) will allow for the consolidation of existing and leased facilities into one operation to accommodate current and future product volumes.