Current Projects

Airdrie Catholic Morningside K-6 School Airdrie, AB

Airdrie Catholic Morningside K-6 School

Client

Calgary Catholic School District

Prime Consultant

Gibbs Gage Architects

Description

Dawson Wallace, working with Gibbs Gage Architects, has been contracted to construct a new school in the Cooper’s Crossing neighborhood of Airdrie which will accommodate 950 students from Kindergarten through Grade 6.

This new school will encompass 40,623 s.f. of new construction over two-storeys. Facilities being incorporated into the complex include feature entryways, a gymnasium with separate boys’ and girls’ change rooms, ancillary rooms, learning commons room, science labs, reading rooms, music room, art room, library, and numerous classrooms on both the main and upper floors. This project is targeting a LEED Silver certification and October, 2019 completion date.

Materials Recovery Facility (MRF) Lethbridge, AB

  • Materials Recovery Facility (MRF)
  • Materials Recovery Facility (MRF)

Client

City of Lethbridge

Prime Consultant

Dawson Wallace Construction Ltd.

Description

The Materials Recovery Facility (MRF) is a new 46,000 s.f. building with a small office component for the City of Lethbridge, to enhance the City’s recycling program. Construction commenced in May 2018 and is scheduled for completion in April 2019.

The building is a pre-engineered structure, with insulated metal panel cladding on the walls and roof. The facility will be clear span, meaning there are no interior columns, with a steel fibre reinforced slab. The building has a loading dock component, large overhead doors and it will be equipped with hand sorting and machinery sorting equipment. There are elevated sorting cabins which will be placed in conjunction with the third party conveyor and baler systems.

Gregg Distributors Foothills Calgary, AB

Gregg Distributors Foothills

Client

Gregg Properties Co. Ltd.

Prime Consultant

Hodgson Schilf Evans Architects Inc.

Description

Dawson Wallace is proud to continue our partnership with Gregg Properties Co. Ltd. having been awarded the General Contracting services to undertake an industrial warehouse expansion, site upgrades, and interior/exterior improvements of their existing building at 51st Street SE, Calgary, Alberta. This project is expected to be complete for November, 2018.

MTE Logistix Distribution Centre Edmonton, AB

MTE Logistix Distribution Centre

Client

MTE Logistix Inc.

Prime Consultant & Architect

Stantec Architecture Ltd.

Description

Dawson Wallace has been selected as General Contractors for this new facility on 21.35 acres at 112th Avenue and 189 Street. This project includes 481,222 s.f. of warehouse space with an additional office component of 20,056 s.f.

Grasslands Logistics Centre Calgary, AB

  • Grasslands Logistics Centre
  • Grasslands Logistics Centre
  • Grasslands Logistics Centre
  • Grasslands Logistics Centre

Client

Morguard Investments Limited (Verus Partners)

Prime Consultant

HK Architectural Services

Description

The Grasslands Logistic Centre is located in the Great Plains Industrial Park in the southeast Calgary. The facility is a light industrial distribution centre that can support multiple tenants. The 214,000 s.f. building consists of insulated metal panels as well as precast “dado” panels around the perimeter of the facility. Dawson Wallace was hired as the General Contractor to complete this building and also as a Design Builder for the mechanical and electrical systems. The project is a “greenfield” site that will be transformed into this distribution facility from beginning of May of 2018 to the anticipated completion in October of 2018. The project is implementing sustainable building practices such as LED lighting, higher insulated roof system as well as energy modeling to ensure it is environmentally friendly.

Horizon Non-Sort Facility Nisku, AB

Horizon Non-Sort Facility

Client

ONE Properties

Prime Consultant & Architect

Gibbs Gage Architects

Description

The Horizon project consists of a one-million s.f. warehouse and logistics building. Its 58-acre site in the Border Business Park will allow for prime access to the QE II Highway and Anthony Henday, providing connections to both Yellowhead Trail/Trans Canada Highway.

Haskayne Legacy Park Pavilion & Pergola Calgary, AB

Haskayne Legacy Park Pavilion & Pergola

Client

The City of Calgary

Prime Consultant

Nyhoff Architecture

Description

The Haskayne Legacy Park Building is located in the Calgary’s northwest section, neighbouring the community of Bearspaw, positioned in the County of Rockyview. This Park Pavilion will be an outdoor/indoor multi-purpose facility with an occupancy of around 50 people. Some unique architectural features are the weathered steel, the wood deck ceiling, along with open glazing, exposed concrete, and a paving stone walkway.

This Pavillion will include washrooms, a decorative fireplace, storage, and a small office space covering approximately 2,420 s.f., with a total site square footage of 68,864 s.f. This project will follow sustainable building initiatives, including a net zero target, along with a geothermal heating system. Anticipated turnover date for the Park Pavilion building is late 2018
.

Aurora Sun Medicine Hat, AB

Aurora Sun

Client

Aurora Cannabis Inc.

Facility Designer

Aurora Larssen Projects Inc.

Description

Dawson Wallace has been selected as the Construction Manager for this new facility in Medicine Hat. At 1.2 million s.f., or over 21 football fields, Aurora Sun will use advanced technologies in its highly automated facility, and will be readily expandable to 1.5 million square feet.

The Windsor Calgary, AB

The Windsor

Client

Arlington Street Developments

Prime Consultant & Architect

NORR Architects

Description

The Windsor project is a multi-phase project which consists of a two level concrete parkade covering the majority of the site, a new six storey residential & commercial building, and a new three storey townhouse, located on Elbow Drive in the southwest Calgary. Dawson Wallace has been involved as the Construction Manager with facilitating design concurrent with construction, along with the Owner and Consultants, to ensure all critical scheduled dates are met. This project has been awarded in multiple phases as required, allowing Dawson Wallace to maintain progress on site with critical tasks. Dawson Wallace continues to work through cost savings and design with the Owner and Consultant team on items not yet fully designed or tendered. The parkade is a secure underground parkade with separate parking levels for residents and visitors to the commercial site. The parkade features high ceilings, and architectural concrete features, as well as having separate mechanical and electrical systems for the operation of the parkade. Finally, there are multiple elevators to service the residents and commercial aspects of the site. The main building will include five floors of 1 and 2-bedroom luxury condos as well as upscale retail commercial spaces for lease. The main level will be designated for retail space and is constructed from structural concrete with a structurally supported slab ceiling structure. The remainder of the floors will be wood frame construction using a pre-fabricated wall panel system for schedule acceleration and ease of construction.

West Granville Centre CRUs 3, 7 & 8 Edmonton, AB

West Granville Centre CRUs 3, 7 & 8

Client

Alldritt Land Corporation

Prime Consultant & Architect

DIALOG

Description

We are proud to have been selected as Construction Managers on this retail development in southwest Edmonton. CRU 3 - 7,771 s.f.; CRU 7 - 6,560 s.f.; CRU 8 - 2,360 s.f.

Amazon - Nose Creek Building E Calgary, AB

Amazon - Nose Creek Building E

Client

QuadReal Property Group

Architect

Gibbs Gage Architecture

Description

Nose Creek Building E is located directly South of Dawson Wallace’s previously completed Nose Creek Buildings A & C site in Balzac, AB. Dawson Wallace was selected as the Construction Manager on this project due to our value engineering, commitment to schedule, and outstanding relationship with the client. Dawson Wallace has mobilized to site while the building is still being designed. Due to the tight schedule, we have proposed schedule saving techniques like frost prevention, precast gradebeams, shrink-wrapping the building, and creating a phased line at the middle grid line of the building to erect steel & precast from each end of the building (essentially building two buildings at once). There willalso be a large TI portion of the job that requires the same completion date as the base building. Dawson Wallace has been working closely with the design team to propose schedule saving techniques in order to meet the schedule demands. This building is scheduled to be completed at the end of September 2018.

Commerce West 2 Edmonton, AB

Commerce West 2

Client

Nearctic Property Group

Prime Consultant & Architect

DIALOG

Description

Located in an active light industrial section of west Edmonton, we are Construction Managers for this 60,945 s.f. building located adjacent to the Commerce West building we previously constructed at 111th Avenue and 153 Street.

Edmonton Business Campus East, Phase 1 Edmonton, AB

Edmonton Business Campus East, Phase 1

Client

Cameron Corporation

Prime Consultant & Architect

Hodgson Schilf Evans Architects Inc.

Description

Dawson Wallace has recently begun work on this 85,573 s.f. office building consisting of three storeys and underground parkade located at 575 - 100 Street NW, Edmonton. We have also been engaged to complete the 17,900 s.f. third floor tenant improvements for HealthPointe Medical Centres in this building.

Emerald Hills Centre, Box C2 and Box E7 Sherwood Park, AB

Emerald Hills Centre, Box C2 and Box E7

Client

ONE Properties

Prime Consultant & Architect

DIALOG

Description

We have recently been awarded the construction of two commercial retail buildings at Emerald Hills Centre. Box C2 totals 18,341 s.f., and Box E7 totals 10,515 s.f.

Airport Crossing Buildings 3 and 4 Calgary, AB

Airport Crossing Buildings 3 and 4

Client

Enright Capital

Architect

DIALOG

Description

Dawson Wallace was awarded Enright’s Airport Crossings Buildings 3 & 4 project following a successful completion of Phase 1 in 2013. This project follows similar structural and architectural designs comprising piles, grade beams, structural steel, and precast panels encompassing newly constructed light industrial space in the Airport Industrial Park.

London Drugs Edmonton, AB

London Drugs

Client

London Drugs Limited

Prime Consultant & Architect

Scientific Architecture Inc.

Description

After recently completing projects for London Drugs in St. Albert and Grande Prairie, we have been selected to complete the 34,789 s.f. interior renovation for them at their Oliver Square location. London Drugs remains open to the public during this extensive renovation.

Strachan Corner Medicine Hat,AB

  • Strachan Corner
  • Strachan Corner
  • Strachan Corner
  • Strachan Corner

Client

Brentwood Developments

Prime Consultant & Architect

DIALOG

Description

Dawson Wallace has been engaged by the Owner, Brentwood Developments, since early 2016 to provide Construction Management services for their proposed Strachan Corner Development in Medicine Hat, Alberta. These services include budgeting, design support, scheduling, tendering, methodology & constructability feedback, and cost control.

Construction commenced in January 2017 and includes the demolition of an existing Wal-Mart and related site surfaces and underground utilities. Phase I of new construction will consist of one box store commercial building of approximately 70,000 s.f. containing room for four different retail shops including a new Save On Foods, and one 10,000 s.f. CRU building. In addition, Phase I also includes new underground services and all site improvements including new asphalt parking lot, sidewalks, site lighting and landscaping. Phase II will see future site expansion, adding additional CRU space, stand alone restaurant pads, various tenant fit-ups, and a gas bar. Dawson Wallace has also been engaged to build a new Tim Hortons on the Brentwood development site.

Aurora Sky Leduc County, AB

Aurora Sky

Client

Aurora Cannabis Inc.

Greenhouse Architect

Larrsen Ltd.

Description

This 800,000 s.f. cannabis production facility is currently under construction at the Edmonton International Airport, under a 30 acre lease from the Edmonton Regional Airports Authority. Aurora Sky is projected to be the world's most advanced cannabis production facility, meeting expanding medical demands. Aurora Sky's location will benefit from services available on site at EIA, including air cargo connections, ground transportation and bonded warehousing, enabling future export of their product and genetics around the world.

West Lethbridge Middle School Lethbridge, AB

  • West Lethbridge Middle School
  • West Lethbridge Middle School
  • West Lethbridge Middle School

Client

Lethbridge School District No. 51

Prime Consultant & Architect

FWBA Architects

Description

Construction of a new 70,000 s.f. middle school complete with full site development. The building is constructed out of both structural steel and load bearing block, with a glazed main entrance and over ten different roof lines. This new school will house a large gym, gathering and ancillary spaces, classrooms, a science and shop space, drama and band rooms, and a large library. The school will also be ringed with modular classrooms and room to accommodate future modulars.

Plaza 167 Edmonton, AB

Plaza 167

Client

Stratosphere Capital (Brintnell) Ltd.

Architect & Prime Consultant

Hodgson Schilf Evans Architects Inc.

Description

We are Construction Managers for this office and retail development at 167th Avenue & Brintnell Boulevard. The development includes a 3-storey office building with 71 stall underground parkade. Each floor will be 17,372 s.f. and will consist of retail, financial, professional and medical tenants. In addition to the office building there will be 3 retail buildings totaling 25,000 s.f. combined.

Alberta Gaming & Liquor Commission Warehouse St. Albert, AB

Alberta Gaming & Liquor Commission Warehouse

Client

Alberta Gaming & Liquor Commission

Description

The AGLC warehouse will serve as the main distribution centre for spirits, wine and imported beer for the Province of Alberta. The building spans 479,000 s.f. on 55 acres of land, including a multi-level main floor and 2-storey shipping office. The complete building (including all equipment and racking) will allow for the consolidation of existing and leased facilities into one operation to accommodate current and future product volumes.